Tuesday, August 27, 2013

State Fair 2013

This year we decided to hit the state fair on a weekday instead of the crowded weekend day. So Kyle took off Monday so we could go. Two unforeseen events leading up to this day made for a not-the-best-trip-to-the-state-fair but we will make due with the cards dealt to us. 1) we didn't foresee this Monday was going to be followed by a weekend of HARD work building a deck, thus leaving us utterly exhausted come Monday and 2) no clue it was going to be the second HOTTEST day on record (the day prior being the first). But we made the best of it and will hope for nicer weather next year.

Our goal was to get up and out early to beat the heat and the crowds. But as I mentioned we were tired so getting up too early would have just made it worse. We got out of the house shortly after 8:00. Stopped to get some on the road McD's breakfast and headed east for the mild drive to the fair grounds. Luckily at 8:20ish the traffic wasn't too bad and we were able to take the HOV lane to miss the worst of it.

Got free parking in the neighboring neighborhood on the street and walked to the entrance. Already feeling the pain from the weekend creeping up in our legs.

state fair 2013-1

We started at the 'Little Farm Hands' section. It's a little simulation course kids walk through and do farmer activities. They recommend 3-10 but we've been excited for Isaac to give it a try so we went ahead this year. He wasn't interested in wearing the apron, but he did take a bucket.
state fair 2013-2

first was the corn siloh, they got a little plastic bag of corn kernels to carry in their bucket.
state fair 2013-3

Next was the tractor trikes
state fair 2013-4

state fair 2013-5

Then we entered a chicken barn where we 'fed' (left) some of the kernals for the chickens in return of an egg (a wooden egg) that got added to our bucket. Then we moved on to get a "seed" (wooden token) that he needed to plant and in return got a piece of plastic veggie to add to his bucket.
state fair 2013-7

state fair 2013-8

He also got a little corn hat to wear, it was so cute.
state fair 2013-9

At this point we were HOT! And very discouraged as this was the first thing of the day we were doing and couldn't believe how hot we already were.... turns out it was just that activity that was super hot and in other parts of the fair grounds it wasn't nearly as bad.

After the veggie, we entered the milk barn where they traded their corn to feed the cow for a container of milk. Then made our way to the orchard to pick an apple.
state fair 2013-10

Oh and LOOK! at what we found, I haven't seen this one before.
state fair 2013-61

At some point he also got a little bag of wool from the sheep barn (there weren't any real animals). After the apple orchard was the market where he got a dollar for trading in all his goods. He enjoyed sorting the items from his bucket. Then he got to trade in his "dollar" for a juice box. At the end of the farm there was a little area with educational booths. He got to plant a sunflower seed to take home and wonder around a bit more.
state fair 2013-11

state fair 2013-12

Then we were off to our next adventure.

Next we stopped at the giant sand box
state fair 2013-13

state fair 2013-15

state fair 2013-17

We met up with some friends at the sand box for a quick hello and Isaac and their boy played in the sand together.

There was a nearby piano set up and it was open and available for anyone to play. A guy sat down and played a few songs. Isaac was immediately tuned in and ran right over to watch. He stood there for a good three or four minutes.
state fair 2013-18

state fair 2013-19

Next stop was the Alphabet Forest. Isaac got to make a farm book with the author of the day.
state fair 2013-20

We got to spell his name out
state fair 2013-21

He helped dada carry it over to the 'photo' spot, but he wouldn't stand their for a photo, so one on the way will have to do.
state fair 2013-23

Then he got distracted by the dancing puppets.
state fair 2013-24

Next stop was to grab some food. We had buffalo chips and watermelon.
state fair 2013-25

state fair 2013-27

Stopped in at the DNR buildling on our way to the animal barns.
state fair 2013-28

state fair 2013-29

Next up was the Miracle of Birth barn. Saw the goats.
state fair 2013-30

state fair 2013-31

Ducklings
state fair 2013-32

Rabbits
state fair 2013-34

Sheep. A pregnant sheep:
state fair 2013-36

And a sheep that had just given birth
state fair 2013-38

And another fairly new lamb
state fair 2013-39

At this point we agreed that the birth barn was good enough and it wasn't really worth trekking all the way to the animal barns (which was located at the opposite corner from where we entered)

We also got to see cows/calfs and pigs.
state fair 2013-44

At this point we were as far as we wanted to go and it was time to turn back and head toward the gate we came in. So we brainstormed what was left that we wanted to do on the way back. (again we were pretty much on the opposite end). I wanted pig lickers (chocolate covered bacon) so we went to the Famous Dave's stand to get those.
state fair 2013-47

Rather disappointing that it was $6 for THREE!!! but I was nice and only had one so everyone could have one.
state fair 2013-49

Then on our walk back we went through a merchant building. Passed a music stand and found a train whistle I'd been wanting to get Isaac. This one is actually called a Riverboat Whistle... but it sounds just like the train one. I also got him some rhythm sticks as he really enjoyed those in our music class over the summer.
state fair 2013-51

Making our way north
state fair 2013-53

Stopped in at the Lego play area
state fair 2013-54

state fair 2013-55

Got distracted by the puppet animals again. He really liked them. They were hooked up to a motor to make them dance otherwise we might have got one...
state fair 2013-57

Passed the alphabet forest again and stopped in to take a look at a picture book
state fair 2013-58

state fair 2013-59

And we finished off with a pronto pup for lunch. Oh yeah Kyle had a root beer float I forgot to take a picture of. It was so blasted hot otherwise we might have enjoyed it more. I was kinda disappointed we couldn't eat more or explore more but we were all hot and tired. And it's too hot all week to go back so we are just fine with hoping next year there's better weather. I think Isaac had fun and we put in a good solid morning there. We left about 1:00, so over four hours at the fair ain't bad.

When we got home Isaac took a good nap and we played around with his new rhythm sticks.
DJP_2559

DJP_2563

Monday, August 26, 2013

New Deck!

Wow, what a weekend to build a deck. Yesterday (Sunday) and today are the HOTTEST days on record, up here in Minnesota!!!! And yes we were outside working our buns off (literally, we had to have lost some fat pounds through all that sweat).

Okay on with my blog. I've been looking forward to sharing this step-by-step because of all the research we did in preparation and how disappointed I was with how little there was on the internet about building a deck. Or this kind of deck anyway, lots of info out there, just not want we were looking for. Or photos showing the under side of cascading box steps.

So months and months ago (when Kyle was still in school) he agreed to build me a new deck. I hated how our originally deck made our backyard seem tiny and was just a big eye sore. It had lattice sides, which were not complete as well as was getting somewhat rotted. When my older brother came to visit a couple summers ago he insisted we replace one piece that was pretty much rotted through. I posted about that deck tear down here: http://bloggingmizdaisy.blogspot.com/2013/07/deck-demolish.html

To pick up where that blog left off, I cleaned the patio off one weekday morning. Got some concrete cleaner and scrubbed that on then went down the road while that soaked in to rent a power washer, came back got it sprayed off and cleaned and returned the washer all before lunch time and Isaac's nap.
Untitled

Oh and I cleaned the area by our garage: (yes this is after, it was MUCH worse before hand - but I didn't have as much time to spend on it)
Untitled

And our table (like last time we had the power washer)
Untitled

The cleaning made a TREMENDOUS difference. You can't see too well because my 'after' pictures were when it was still wet, but it looked like a different deck once it was dry.
Untitled

Once it was cleaned we filled in those rebar divots with concrete patch. (picture is before it was completely dry)
Untitled

Here is some of our sketch work at where the deck would be
Untitled

A little story here before I get into the deck re-build. So August 14th we went into Home Depot with the intention of buying all our supplies and starting that weekend (Saturday the 17th). We talked with a guy who was rather discouraging but in the end it was a good thing. He stressed the fact about having a city permit for building and wasn't as helpful as we had hoped. So after Kyle got quite aggravated from this guy we decided to just get the concrete patch and the concrete dek-blocks and NOT get any supplies and put off building the deck until we looked into a permit.  Long story short we DIDN'T need a permit because it A) was under 30" and B) wasn't attached to the house (which Kyle says he already new but didn't make that clear when dealing with the HD guy). But this did make us go back and draw out better blue prints, talk over EVERY detail, be much better prepared, and have a specific shopping list of what to get (down to the last inch of wood needed and number of screws we'd need) So even though that guy pissed us off, he ended up helping in the end making us better prepared for our project.

So we had our nanny come watch Isaac Friday night and we set off to Home Depot for our supplies:
  • 3" Deck screws (500+)
  • New saw
  • 4 x 4 (frame posts) 9' worth = 10' piece
  • 2 x 6 (everything else) 200' worth
  • 2 x 12 (facing sides of the frame) We didn't end up getting this piece because it wasn't the same type of wood and was not as pretty. Since it was going to be the showing side of the first step we didn't want to get a piece that wouldn't match. And this piece was also for when our plans had us using stringers, since we decided to go with boxes it wasn't as needed.
  • 1 x 6 (planks for the top and top of steps) 144' worth = ended up getting 164' and still had to go back to get 4 more 10' pieces. 
All our wood was pressure treated cedar.

And of course we ran into the guy I mentioned above. Although it was good because we were able to get some closure sharing with him that we did in fact NOT need a permit. He said "that's good as long as you are sure". And he actually was helpful in our saw purchase. We have a miter saw, but it is an oldie that I had purchased for $30 at a garage sale. Got the job done for things we've made so far, but wasn't going to be the best for this deck. So we got a sliding compound miter saw which was AWE-some and did an amazing job cutting - like butter. The guy shared that all Ridgid tools have a lifetime warranty repair through HD, which was super helpful as we were leaning toward a Dewalt saw, so that persuaded our purchase.

So we got our supplies and got a truck rented to haul it all home
Untitled

Untitled

Saturday morning we got up, fixed a good breakfast and got started about 10:00. Our friend, Al, came over about that time. Our goal was to get the frame built on Saturday, because I had to go into work at 2:30. But since we had help our goal B was to get the boxes for the stairs made. We met our goal and all with the help of Al. It was so much help having a third person there because when I had to step away to tend to Isaac, work could still go on. Then I would come back and we'd have three people at it again. Here's the progress from Saturday:

We moved the cinder block steps. Here's a good picture of my deck cleaning before/after. I didn't move the blocks to clean since this is going to be under the deck anyway
IMG_3025

Posts in place, well pulled out a bit. We needed to be able to get around it to screw in the joists.
IMG_3026

IMG_3027

starting on frame, Isaac helping
IMG_3028

Getting joists put in.
IMG_3029

Frame made and moved into place, Isaac helping again.
IMG_3030

Working on the boxes that will be the steps. Oh and decided to pull the fan out to try and make it a little less hot.
IMG_3032

Step number one and step number three
IMG_3033

IMG_3034

IMG_3035

And here's where we ended for Saturday. The first and third boxes are completely built, but none of the boxes are attached. The middle box was going to need some more adjustments because of where it butts into the dek-blocks. The joists were cut but not installed so that it would be easier to cut out the notches the next day.
IMG_3037

Of course Saturday had to be a busy/rough night at work, I was exhausted all shift from working outside all morning but had to work the evening away. Sunday I wasn't looking forward to rising early, but the motivation of getting the deck done got us through. Another friend came to help on Sunday, Kent, arrived about 8:30. Sunday was said to be the hottest day of the summer so it was in our best interest to get up early and get started at the coolest part of the day. Which wasn't that cool. It started off in the high 70's reaching 90's by noon. Again it was HUGE having another hand to help. We were so blessed with friends offering up their time to come help us. Kent brought his circular saw, which as you'll soon see was essential.

So Sunday's first plan was to get that second box figured out. Since our plan measurements were from the frame edge (not the posts) we needed to add in that extra board to fill that space. We started by adding the 2x6's to the frame.
IMG_3038

IMG_3039

We had to rip the bottom 2x6 to get it to fit, more so at one end than the other. The deck is as level as we wanted it, we let there be a slight slant to account for rain drainage.
IMG_3040

Here we are cutting out the notches in the second box step so we can attach it to the frame boards and have space for where the dek-blocks stick out.
IMG_3043

IMG_3044

IMG_3046

Our little battery powered circular saw actually came in handy for the corner edge where Kent's saw was too big to fit.
IMG_3047

We even needed to pull out our reciprocating saw.
IMG_3048

We ended up unscrewing a board of the box to finish off the notches.
IMG_3049

Getting the joists in box #2 and Isaac helping to clean up with me
IMG_3050

IMG_3051

IMG_3052

IMG_3053

Getting the planks on step #3. Our third step didn't go all the way back because of the dek-blocks.
IMG_3054

We needed a plank in the corner for support and went ahead and put a scrap in between although it isn't visible (I was worried it would be)
IMG_3055

It is visible on the other side however.
IMG_3056

Attaching step #2 to step #3 using scraps. Box #2 did go all the way back and was attached to the frame.
IMG_3057

IMG_3058

Starting on box #2's planks. We had a 1/2 inch overhang. and about a 1/8" space in between planks.
IMG_3059

IMG_3060

IMG_3061

Last box step!!! Box #1 now in place. We had to toenail in the top box since it was too narrow to get our drills into.
IMG_3062

IMG_3063

We put three planks on step #2 even though you could mainly see two, we needed a sliver of the third. Then we used a scrap for the fourth placement to help steady the top box step.
IMG_3064

Inside view
IMG_3065

Side view. We choose to come in on this side 12" because we have a basement window there.
IMG_3067

Can you see the three steps? haha
IMG_3070

We liked the look of the staggered ends vs. angle cut. Another positive is the staggered is much easier to complete and it's suppose to be good for when it swells.
IMG_3071

As you can see we were left with a little space on step #1. Kent ripped a nice couple piece to fit in and Kyle tacked them in with the nail gun since they were so small.
IMG_3072

IMG_3073

We got the corner top plank in as our last step before a break:
IMG_3074

At this point we had two 16' planks left and knew we would need more to complete the top and it was about 12:30 so we thought it was a great place to stop for lunch. Isaac was nearing the end of his rope as well. He had done so good all morning, playing outside, being a helper, playing in the living room and watching us from the back door. But he was getting hungry and tired and we knew we needed to tend to him. Kent finished up with us as it was a good place to finish off with just two people, Kyle ran to get us lunch. Came back and we all ate then I put Isaac down for nap while Kyle ran to get more wood. We originally wanted eight-foot pieces, but they didn't sell them. Since we didn't have room to get the 16' pieces home he just got four ten foot pieces.

Now that Isaac was down the two of us could pound the rest of the work out and get it finished. Kyle cut the pieces and I screwed them in, just as we had done before. But it went a little slower since I couldn't screw them in as fast as he cut them.
IMG_3075

He did help with one screw.
IMG_3076

Good-bye ugly part of the patio
IMG_3077

We knew we were going to have to rip the last piece. Kent had asked if he wanted us to leave the circular saw but we thought HD would be able to cut our piece (which at the time we were wanting to be cut to 5") so he took it with him. Turns out HD wasn't able to cut pieces length wise and we ended up needing 3 3/4 " anyway, not 5".
IMG_3078

We tried our little 18 volt saw... it was crap! The blade started to bend 6 inches in and the wood was scrapped. Luckily Kyle got an extra piece so we had another to use. We were going over to Kent's house for dinner anyway that evening so we just decided to measure out the piece and bring it with us.
IMG_3079

So our deck was (almost) FINISHED!
IMG_3080

Here's where we put a shorter board in to account for the dryer vent.
IMG_3083

IMG_3084

Harpo liked it!
Untitled

We cleaned up what we could, took showers, sat down for five minutes... then went to make sure the board would fit in Kyle's car and the battery was dead.... Turns out Friday night when we were unloading the home depot truck, a little someone was hanging out in the back of the Subaru watching us... and turned on the overhead light. So since it was two days later, it's only natural for the battery to be dead. So while Isaac was still asleep, I pulled my jeep around to jump Kyle's. We let it run while we went inside and woke up Isaac to head to our friend's house, plank board in tow.

Got the board ripped, had dinner, sat in air condition, and enjoyed a nice visit. When we got home Kyle cut the board to the correct size. I got the sprinkler going because the grass was so bone dry... which Isaac had to play in for a bit. And since he was so cute I had to watch him for a minute.
sprinkler-3

sprinkler-5

sprinkler-7

sprinkler-8

Then we screwed in the final piece. VIOLA!!! It's DONE! And we love it!

IMG_3099

IMG_3102

(glamour shots of Isaac on the deck)
IMG_3103

IMG_3104

All images are copyright of Daisy Simpson. It is unlawful and illegal to copy, scan, alter or edit the images in any way. This depreciates the photos value as well as my reputation, I take great care in capturing and editing each image and they are each important to me. Thank you for respecting my passion and my copyright.